Price: $15,999,000 | ID #: 1011472468 |
Bedrooms: 8 | Full Baths: 7 Half Baths: 1 |
Square Footage Living Area: 7327 | Lot Size: 30862' |
Zoning: 2300 | View: Garden View,Pool Area View |
Garage Size: 3 | Area: 41 |
County: Miami-Dade County | Status: ACTIVE |
Tax ID: 30-41-31-055-0040 | Tax Information: Tax Reflects No Exemptions |
Annual Property Tax: $66,226.00 | Tax Year: 2022 |
Year Built: 2016 | Subdivision:PONCE GATE |
Roof Type: Flat Tile Roof | Sewer: Septic Tank |
Construction Type: Other Construction | Water Supply: Municipal Water,Well Water |
Cooling: Ceiling Fans,Central Cooling,Electric Cooling | Lot Dementions: 1/2 To Less Than 3/4 Acre Lot |
Heating: Central Heat,Electric Heat | Parking: Driveway,Pavers |
Faces:East | Subdivision Information:No Subdiv/Park Info |
Pool: YES | Pool Description: Below Ground Pool |
Waterfront: NO |
Design Description: Two Story | Water Access: None |
Equipment & Appliances: Dishwasher,Disposal,Dryer,Icemaker,Intercom,Microwave,Other Equipment/Appliances,Gas Range,Refrigerator,Wall Oven,Washer |
Exterior Features: Built-In Grill,Fence,High Impact Doors,Exterior Lighting,Open Balcony |
Legal Description.: PONCE GATE PB 169 - 025 T - 23089 LOT 4 BLK 1 LOT SIZE 30862 SQ FT M/L FAU 30 - 4131 - 016 - 0380 |
Listed On YYYY-MM-DD: 2023-10-30 |
Extraordinary 7,939 SF estate on a sprawling 30,862 SF lot in the highly coveted Ponce/Davis neighborhood, with 8-BD, 7.5-BA, and a detached 2-story guest house. No expense was spared on finishes and custom design features throughout the home, with volume ceilings, marble and herringbone hardwood floors, and impact windows/doors. A chef’s kitchen offers floor-to-ceiling cabinetry, granite countertops, marble backsplash, high-end appliances, butler pantry, and wet bar. Beautifully manicured grounds include an al fresco dining/ living area, summer kitchen, pool with underwater audio system, and a cabana bath. Includes a security system, whole-house generator, and an insulated 3-car garage with AC, that is currently converted to a gym. Final phase of construction completed in 11/2023. |